This method outlines the required resistance measurements that must be taken using an ohmmeter to verify whether the Hall inputs are functional. The measurement results must then be forwarded to our Field Application Engineers for assessment.
Hall Connectors Pin Assignment
FBL/FBLG Motor Drives


SBL/SBLG/GBL/GBLG Motor Drives


For more information regarding the Hall connectors refer to each motor drive's datasheet.
Measuring the Hall Inputs
The following images illustrate how to use a digital multimeter in resistance measurement mode (Ω) to measure the resistance between each Hall input (A, B, and C) and GND.
| NOTICE! | The power supply must be disconnected from the drive before performing the measurements |
SBLG2 Motor Drive


GBLG2 Motor Drive


FBLG2 Motor Drive

Recording the Resistance Values
Use multimeter to measure the resistance between hall A to GND, Hall B to GND, Hall C to GND.
Resistance Of Hall Sensors | |||
Hall Sensors With Respect GND | |||
Channel 1 | Channel 2 | ||
Hall A | Hall A | ||
Hall B | Hall B | ||
Hall C | Hall C | ||
Use multimeter to measure the resistance between hall A to 5V, Hall B to 5V, Hall C to 5V.
Resistance Of Hall Sensors | |||
Hall Sensors With Respect 5V | |||
Channel 1 | Channel 2 | ||
Hall A | Hall A | ||
Hall B | Hall B | ||
Hall C | Hall C | ||